The Problem


  • The project involved approximately 500m² of newly installed marine ply roofing at Thornhill Power Station that required immediate protection

  • As the works were taking place during a challenging time of year, available weather windows were short and unpredictable

  • The new ply substrate was vulnerable to moisture ingress before final protection was installed, posing a risk to the roof’s integrity

  • The client required a solution that could be installed and cured quickly, reducing exposure to rain and adverse conditions

  • A robust, reinforced system was essential to provide long-term durability and withstand the demands of an industrial environment