The Problem

  • This was a large roof and gutter dilapidation project
  • The original contractor had been replaced due to slow progress against a tight deadline, for us, this meant the challenge was to apply during the
    worst weather months of the year

 

P&O  case study image

 

How did we approach the challenge

Site inspection between our technical team and the new contractors to understand what was the best solution given the job size and weather constraints. Advised on the use of Advantage® Graphene for the cut edge corrosion and also Advantage® Gutter – with the weather fluctuations, these products will come in to their own, with cold temperature and damp tolerance on application abilities as well as a speedy cure.