The Problem

  • Old building which had been out of use for years 
  • Leaking from the large roof area due to numerous areas on the roof
    having failed from extensive corrosion
  •  Limited budget 

 

severn bridge case study image 2 (2)

How did we approach the challenge: 

Initial  site visit between our technical team and contractor. Provided guidance on the best system to use with the substrate and explained how this would tackle areas that were weak and that need strengthening.