The existing 300m² kennel roof at Brighton & Hove Dog Racing Track was suffering from ongoing leaks, allowing water ingress that threatened the integrity of the building and the welfare of the kennels below
The original mineral felt roof covering was breaking down, showing signs of age-related deterioration that could no longer provide reliable weather protection
Any roofing works needed to be carried out with minimal disruption to daily operations, as the kennels remained in use and downtime had to be kept to an absolute minimum
Traditional roofing solutions involving strip-out, noise, and long curing times were not suitable for a live animal environment
A solution was required that could be applied directly over the existing mineral felt, avoiding the need for costly removal or extensive preparation works
Due to the operational constraints, a fast-curing system was essential—one that could be installed quickly and return the roof to full service in the shortest possible time
The client needed a long-term, watertight solution that would extend the life of the roof while reducing future maintenance concerns